R. D. Starwalt's Discussions (563)

Discussions Replied To (51) Replies Latest Activity

"That design is very cost effective, flexible and intended to be built with usually a…"

R. D. Starwalt replied Nov 20, 2012 to Drawings of the machine

90 Nov 20, 2012
Reply by R. D. Starwalt

"Nice work Kevin! A+ Without doing a complete cost analysis of an 'erector set' syste…"

R. D. Starwalt replied Nov 17, 2012 to Drawings of the machine

90 Nov 20, 2012
Reply by R. D. Starwalt

"I am sorry to hear of your tooth issue but glad you are feeling some better. Pain cr…"

R. D. Starwalt replied Aug 18, 2012 to 3DR/DIY Drones Servo Board Project

21 Oct 22, 2012
Reply by Monroe Lee King Jr.

"+1 on the Gecko products. Absolutely solid and well supported. They have years of ex…"

R. D. Starwalt replied Aug 17, 2012 to 3DR/DIY Drones Servo Board Project

21 Oct 22, 2012
Reply by Monroe Lee King Jr.

"The essential portion of this project is the machine proper - the steel holding, mov…"

R. D. Starwalt replied Aug 16, 2012 to DC Servo Motor Controls

21 Aug 16, 2012
Reply by R. D. Starwalt

"Thank you Kevin. I had heard about this project and there has been considerable effo…"

R. D. Starwalt replied Aug 16, 2012 to Stepper Motor Controls

4 Aug 28, 2012
Reply by Chris Biernacki

"I too agree that having 3DR involved is a good idea. What we don't know is their lev…"

R. D. Starwalt replied Aug 16, 2012 to DC Servo Motor Controls

21 Aug 16, 2012
Reply by R. D. Starwalt

"DIY/ Purchased Kit Stepper Control #1 - Linistepper This popular OPEN SOURCE stepper…"

R. D. Starwalt replied Aug 11, 2012 to Stepper Motor Controls

4 Aug 28, 2012
Reply by Chris Biernacki

"Elm Chan <-----Click there, scroll to the bottom of the page. 'Firmware' is what…"

R. D. Starwalt replied Aug 10, 2012 to Gauging Interest in the CNC Machine

169 Aug 16, 2012
Reply by Monroe Lee King Jr.

"The *initial code* for the Elm Chan board (pre UHU) is available - I downloaded it.…"

R. D. Starwalt replied Aug 10, 2012 to Gauging Interest in the CNC Machine

169 Aug 16, 2012
Reply by Monroe Lee King Jr.

RSS

Social Networking

Contests

Season Two of the Trust Time Trial (T3) Contest has now begun. The fourth round is an accuracy round for multicopters, which requires contestants to fly a cube. The deadline is April 14th.

A list of all T3 contests is here

Advertisement

© 2013   Created by Chris Anderson.   Powered by

Badges  |  Report an Issue  |  Terms of Service