One of the main challenges faced with BatMon was the installation overhead. Installing BatMon v3 took over an hour on a new battery pack. Second challenge was the cost overhead of a BMS system on each battery. We have reduced these issues significantly with the BatMon v4 release.
One of the main challenges faced with BatMon was the installation overhead. Installing BatMon v3 took over an hour on a new battery pack. Second challenge was the cost overhead of a BMS system on each battery. We have reduced these issues significantly with the BatMon v4 release.
- v4 is super fast to install on most batteries with a tool, and connects to the balance leads.
- The modular board make it possible to reuse BatMon after end of life of a battery. The XT90 leads can be replaced if they are worn, but can practically be reused few times, reducing the cost overhead on each smart battery pack.