Relative newbie here looking for advice: I've done one ARF build and am now trying to move into DIY territory.

I'm setting up an APM 2.8 and I have a spare PMU from a Naza Lite system. Is there any reason I can't use the Naza PMU to power the APM? I don't want to fry anything. 

Thanks.

Views: 23

Reply to This

Groups

Season Two of the Trust Time Trial (T3) Contest 
A list of all T3 contests is here. The current round, the Vertical Horizontal one, is here

© 2019   Created by Chris Anderson.   Powered by

Badges  |  Report an Issue  |  Terms of Service